1·A method of calculating ore quantity in practical open pit mine is given.
提出了一种可用于实际露天矿的矿量计算方法。
2·The slope-sliding of Union Valley Open Pit Mine began at the mine development stage.
团结沟露天矿从基建时起即开始滑坡。
3·The crusher is the key technology for semi-continued overburden stripping operation in open pit mine.
实现露天矿表土剥离采用半连续工艺的关键技术是破碎机。
4·At some uranium open pit mine, the sources of dust and radon have been investigated since its establishment.
某露天铀矿从开始建矿起就对粉尘和氡的来源进行研究。
5·Open pit mine is excavated in hills land. Surroundings safety is seriously influenced. Therefore, mine safe production is broken.
在丘陵地区进行露天开采,地面变形对周边环境安全影响非常大,从而严重地影响到安全生产。
6·According to the characteristics of soot pollution in open pit mine, an integration evaluation system composed of GIS and ES is developed.
针对露天采矿烟尘污染的特点,提出了地理信息系统与专家系统相集成的综合评价系统。
7·The problem of vehicle scheduling in open pit mine are analyzed to build the mathematical model of resolving the vehicle scheduling problem.
分析露天矿车辆调度问题,建立求解矿山车辆调度问题的数学模型。
8·This article illustrates how open pit mine adjusts the striping schedule so as to lower down production cost and improve enterprise benefits.
本文对露天矿调整采剥进度计划,降低生产成本,提高企业效益作了阐述。
9·The choice of mining technology for open pit mine is an important part of open pit design, which will directly affect the economic benefits of mine.
露天矿开采工艺的选择是露天矿设计的重要环节,直接影响到露天矿的经济效益。
10·According to the dust pollution of open pit mine, the measures of preventing the dust pollution were raised in order to clean environment in mining area.
通过分析露天矿采场粉尘的污染情况,提出了粉尘污染治理的措施,达到了清洁矿区环境的目的。